JoistLedgerSpans, joists and footings straight from the code tables.

Decking for a 28 × 10 ft deck in ipe, herringbone layout

1 × 6 ipe boards
72× 10 ft
60 rows across 28 ft — 720 linear ft including 20% waste
Plan — boards across the joists28 ft10 ft60rows5.688″ repeatactual width + gap72 boards · 1,320 screws
Boards to buy72× 10 ft
Linear feet600 ft plus 20% waste720ft
Rows of decking28 ft ÷ 5.688″ repeat60rows
Board repeat5.5″ actual width + 0.1875″ gap — not the nominal size5.688in
Deck area28 × 10 ft280ft²
Joists crossedat 12″ o.c. over 10 ft11joists
Deck screwstwo per board-joist crossing — about 4 boxes of 3501,320screws
Layouttwo cuts on most boards and offcuts that fit nothingherringbone
Butt joints10 ft boards cover the 10 ft run in one pieceNone needed
Deck width
28 ft
Deck length
10 ft
Board
ipe
Layout
herringbone
Joist spacing
12 in o.c.

Nominal width is not actual width

This is where board counts go wrong. A ipe board measures its real width, and with the gap it needs the repeat is 5.688″ — which is what actually decides the row count.

28 ft of deck at that repeat is 60 rows, and 72 boards once 20% waste for the herringbone layout is added.

Working from the nominal size undercounts by close to a tenth.

The gap is not optional in either direction

Treated lumber is sold wet and shrinks. Composite expands with heat. Gap too tight on composite and it buckles in July; gap too wide on wet treated lumber and by autumn you have gaps that swallow a phone.

Screws

1,320 — two at every board-joist crossing, across 11 joists. One screw per crossing lets the board cup and lift at the corner, and that is the single most common reason a deck looks tired after two summers.

Read the end grain

Lay boards bark-side up. A board cups away from its bark side, so bark-up sheds water off the crown rather than holding it in a trough.

Butt joints

Where the run exceeds a standard board length, stagger the joints so no two adjacent rows meet over the same joist — and double the joist under every joint. A butt joint on a single joist gives each board about ¾ inch of bearing, which is not enough for either board.

Notes

  • **Nominal width is not actual width.** A "1 ×" board measures 5.5″ across. With a 0.1875″ gap the repeat is 5.688″, which is what decides the row count — 60 rows here. Working from the nominal size undercounts by close to a tenth.
  • Very dense and very stable; pre-drill every fastener. The gap is not optional in either direction: too tight on composite and it buckles in July; too wide on wet treated lumber and you get gaps you can drop a phone through by autumn.
  • Herringbone layout, 20% waste — two cuts on most boards and offcuts that fit nothing. Order the full allowance in one go; diagonal offcuts rarely fit anywhere else on the deck.
  • A 10 ft board covers the 10 ft run in one piece. Worth paying for: an unbroken board is stronger, drains better and looks like a deck rather than a repair.
  • Fasten with two screws at every board-joist crossing — 1,320 screws here. One screw lets the board cup and lift at the corner, and it is the single most common reason a deck looks tired after two summers.
  • Lay the boards bark-side up if you can read the end grain. A board cups away from the bark side, so bark-up sheds water off the crown instead of holding it in a trough.

Nearby sizes

Read more