Decking for a 22 × 16 ft deck in ipe, straight layout
| Boards to buy | 50× 16 ft |
|---|---|
| Linear feet752 ft plus 5% waste | 790ft |
| Rows of decking22 ft ÷ 5.688″ repeat | 47rows |
| Board repeat5.5″ actual width + 0.1875″ gap — not the nominal size | 5.688in |
| Deck area22 × 16 ft | 352ft² |
| Joists crossedat 24″ o.c. over 16 ft | 9joists |
| Deck screwstwo per board-joist crossing — about 3 boxes of 350 | 846screws |
| Layoutboards run perpendicular to the joists — least waste | straight |
| Butt joints16 ft boards cover the 16 ft run in one piece | None needed |
- Deck width
- 22 ft
- Deck length
- 16 ft
- Board
- ipe
- Layout
- straight
- Joist spacing
- 24 in o.c.
Nominal width is not actual width
This is where board counts go wrong. A ipe board measures its real width, and with the gap it needs the repeat is 5.688″ — which is what actually decides the row count.
22 ft of deck at that repeat is 47 rows, and 50 boards once 5% waste for the straight layout is added.
Working from the nominal size undercounts by close to a tenth.
The gap is not optional in either direction
Treated lumber is sold wet and shrinks. Composite expands with heat. Gap too tight on composite and it buckles in July; gap too wide on wet treated lumber and by autumn you have gaps that swallow a phone.
Screws
846 — two at every board-joist crossing, across 9 joists. One screw per crossing lets the board cup and lift at the corner, and that is the single most common reason a deck looks tired after two summers.
Read the end grain
Lay boards bark-side up. A board cups away from its bark side, so bark-up sheds water off the crown rather than holding it in a trough.
Butt joints
Where the run exceeds a standard board length, stagger the joints so no two adjacent rows meet over the same joist — and double the joist under every joint. A butt joint on a single joist gives each board about ¾ inch of bearing, which is not enough for either board.
Notes
- **Nominal width is not actual width.** A "1 ×" board measures 5.5″ across. With a 0.1875″ gap the repeat is 5.688″, which is what decides the row count — 47 rows here. Working from the nominal size undercounts by close to a tenth.
- Very dense and very stable; pre-drill every fastener. The gap is not optional in either direction: too tight on composite and it buckles in July; too wide on wet treated lumber and you get gaps you can drop a phone through by autumn.
- Straight layout, 5% waste — boards run perpendicular to the joists — least waste. This is the least wasteful way to lay a deck, and the fastest.
- A 16 ft board covers the 16 ft run in one piece. Worth paying for: an unbroken board is stronger, drains better and looks like a deck rather than a repair.
- Fasten with two screws at every board-joist crossing — 846 screws here. One screw lets the board cup and lift at the corner, and it is the single most common reason a deck looks tired after two summers.
- Lay the boards bark-side up if you can read the end grain. A board cups away from the bark side, so bark-up sheds water off the crown instead of holding it in a trough.
Nearby sizes
- Decking for a 20 × 16 ft deck in ipe, straight layout
- Decking for a 24 × 16 ft deck in ipe, straight layout
- Decking for a 18 × 16 ft deck in ipe, straight layout
- Decking for a 26 × 16 ft deck in ipe, straight layout
- Decking for a 22 × 14 ft deck in ipe, straight layout
- Decking for a 22 × 18 ft deck in ipe, straight layout
- Decking for a 22 × 12 ft deck in ipe, straight layout
- Decking for a 22 × 20 ft deck in ipe, straight layout
- Decking for a 22 × 16 ft deck in cedar, straight layout
- Decking for a 22 × 16 ft deck in composite, straight layout
- Decking for a 22 × 16 ft deck in ipe, diagonal layout
- Decking for a 22 × 16 ft deck in ipe, herringbone layout
- Decking for a 22 × 16 ft deck in ipe, straight layout
- Decking for a 22 × 16 ft deck in ipe, straight layout
Read more
- Deck Screws per Square Foot: The Count, the Length, and the Coating That MattersRoughly 350 screws per hundred square feet at standard spacing — and the coating rating matters more to the deck's life than the count does.
- Cost to Replace Deck Boards Only: When Resurfacing Beats RebuildingResurfacing saves roughly half the cost of a rebuild, provided the frame underneath has more life left than the boards you are about to screw to it.
- Hidden Deck Fasteners or Face Screws: Cost, Speed, and the Repair ProblemHidden fasteners cost roughly three times as much and look better. The question that decides it is what happens when one board in the middle needs to come out.
- Deck Board Gap: Why Wet Lumber and Composite Need Opposite NumbersThere is no single correct gap. There is a correct gap for a board that is going to shrink and a different one for a board that is going to grow.